Skip links
Home Improvement Loans: Choosing the Right Way to Pay for Repairs

Home Improvement Loans: Choosing the Right Way to Pay for Repairs

A leaking roof rarely waits for a bonus month, and a geyser does not care that school fees are due. That is why most searches for home improvement loans start with a quote already in hand and a simple question behind it: what is the cheapest sensible way to pay for this? In South Africa the answer depends less on the loan itself and more on two things you already know, namely whether you own the home with a bond on it, and how big the job really is.

Five ways to pay for the same renovation

A “home improvement loan” is not one product. Lenders use the term loosely, and the money can come from very different places with very different consequences.

1. Drawing on your existing bond

If you have paid your home loan down below its original amount, many banks let you borrow some of that back. Absa calls this a ReAdvance, and other banks use similar terms such as access bond or available funds. Because the money comes from a bond that is already registered, there is usually no new registration at the deeds office, so it can be fairly quick once approved. Absa, for example, lists a minimum of R20 000 for a ReAdvance and no bond registration fees.

The interest rate is normally your existing home loan rate, which is usually far lower than unsecured credit. The catch is time. Money drawn from a bond is repaid over whatever is left of the bond term, which may be 15 or 18 years. A R40 000 kitchen spread over that long can cost more in total interest than a shorter, pricier loan, unless you deliberately pay it back faster.

2. A further advance or further loan

When there is nothing left to redraw, some lenders will lend against the current market value of your home, which may have risen since you bought it. This is a further advance, and it is registered as an addition to your existing bond. That means a property valuation, a conveyancing attorney and registration costs. Absa sets its minimum at R50 000 and confirms that bond registration fees apply.

Further advances make sense for larger projects, such as an extra room or a full bathroom refit, where the amount justifies the paperwork and fees. For a R15 000 repair they rarely do.

3. A building loan

Bigger structural work, or building on vacant land, is often financed with a building loan. Rather than paying out in one lump sum, the bank releases money in stages, commonly four, after a valuer inspects the progress. Any deposit you have paid is used first. It is slower and stricter, but staged payments protect you from paying for work that has not been done.

4. An unsecured personal loan

This is the route for renters, for people whose homes have no bond or title deed, and for anyone who simply does not want the house on the line. You borrow a fixed amount, repay it over a set term, typically somewhere between one and six years, and the lender has no claim on your property. Our guide to how unsecured loans work covers the basics.

The trade off is price. Under the National Credit Regulations, the maximum interest a lender may charge on an unsecured loan is the repo rate plus 21 percentage points a year, compared with repo plus 12 for a mortgage. Most borrowers pay less than the cap, but the gap between secured and unsecured pricing is real. Plenty of people use it anyway. Absa has reported that home improvement makes up close to a quarter of the personal loans it books, often for owners with no bond or title deed to borrow against.

5. Store or supplier credit

Hardware chains and building suppliers increasingly offer finance for materials, sometimes paid straight to the retailer. This stops loan money drifting into other expenses, and some schemes let leftover funds cover delivery or labour. Treat it like any other credit agreement: ask for the full quotation, check the term, and do not let in-store convenience rush the decision.

Matching the route to the job

As a rough guide, size and urgency point to one option or another.

  • Urgent repairs under about R20 000 (a burst geyser, a broken gate motor, storm damage the insurer won’t cover): check your emergency savings first, then an unsecured loan with a short term, or a bond redraw if you have one and are disciplined about repaying it quickly.
  • Planned upgrades from R20 000 to R100 000 (a kitchen, tiling, a carport): a bond redraw is often cheapest, with an unsecured loan as the alternative for renters or owners without a bond.
  • Major alterations above R100 000 (an extra bedroom, a second storey, a granny flat): a further advance or a building loan, where staged payouts and inspections earn their extra paperwork.

These bands are not rules. A homeowner with a bond that has only five years left may find a redraw costs very little over time, while someone with 18 years still to run may prefer a separate loan they can clear in three.

Turning a builder’s quote into a loan amount

Consider a hypothetical household in Pietermaritzburg. The Dlaminis have a roof that leaks over two bedrooms, and a contractor has quoted R38 000 to replace rotten trusses and re-sheet one side. Before they apply anywhere, there are a few steps worth taking.

Get at least two written quotes. Two quotes show whether the scope and price make sense, and a detailed quote listing materials, labour and rubble removal is far easier to hold a contractor to.

Add a contingency. Renovations uncover surprises, especially in older houses. A contingency of 10% to 15% on top of the quote is a common rule of thumb. For the Dlaminis, that lifts the planning figure to roughly R42 000 to R44 000. They could borrow that amount, or borrow R38 000 and keep the contingency in savings, which is cheaper if the surprises never come.

Subtract what you already have. If R10 000 sits in an emergency fund, putting some of it towards the job reduces the loan and the interest on it. Keeping a small buffer still matters, because the next emergency will not wait for this loan to be repaid.

Test the instalment against your budget, not the lender’s. A lender’s affordability assessment checks that you can repay. It does not know that your car service is due in March. Run the expected instalment through the debt-to-income calculator and then through your own month, line by line.

What the interest rate does not show you

It is easy to compare home improvement finance on the interest rate alone, but the full cost depends on several other things.

For a further advance there are valuation and registration costs, and the initiation fee on a mortgage agreement can be considerably higher than on a personal loan. The regulations cap it at R1 100 plus 10% of the amount above R10 000, to a maximum of R5 250 before VAT. For an unsecured loan, an initiation fee and a monthly service fee are usually added, and credit life insurance is often required. Under the National Credit Act you are allowed to replace the lender’s credit life policy with one of your own, as long as it meets the requirements.

Then there is the term. The longer the loan, the lower the instalment and the higher the total you repay. Ask every lender for the pre-agreement statement and quotation, which by law must set out the total cost and stays valid for five business days. That gives you time to compare offers properly rather than signing on the spot.

When the house becomes the security

Bond redraws, further advances and building loans are all secured against your home. That is why they are cheaper, and it is also the risk. If repayments fall behind, the bank can take legal action under the bond, and in the worst case the property can be sold in execution to settle the debt. Adding a renovation to your bond also means you will owe more on the house, which matters if property values fall or you need to sell sooner than planned.

An unsecured loan does not put your home at risk in the same way, but missed payments still lead to arrears, collection costs, a damaged credit record and possibly a court judgment. Neither route is safe if the instalment was a stretch from the start.

Before any money changes hands with a builder

Structural changes, extensions and many alterations need written approval from your municipality before work begins, under the National Building Regulations and Building Standards Act. Unapproved work can cause problems when you sell, and some lenders will want approved plans before releasing larger amounts. Estates and sectional title schemes often have their own rules on top of the municipal ones.

Pay contractors in stages tied to completed work rather than handing over most of the money upfront. A reasonable deposit for materials is common, but a builder who wants the full amount before starting is asking you to carry all the risk. Keep every quote, invoice and proof of payment.

When borrowing is the wrong answer

Some improvements pay for themselves over time, such as fixing a roof before water damages the ceilings or replacing a failing geyser with a more efficient one. Others are nice to have. Borrowing for a cosmetic upgrade while you already carry store cards and a car loan can leave you paying for a kitchen long after it stops feeling new. If existing debt is the real problem, look at debt consolidation options before adding another instalment.

It can also be worth splitting a project. Fix the urgent, structural part now with the smallest loan that covers it, and save for the finishes. Paying cash for the second phase is almost always cheaper than financing everything at once.

Comparing offers for your project

If you have a quote and a budget that works, the next step is to compare what registered lenders are willing to offer. Mashonisa is a comparison service, not a lender, so we help you see options from credit providers in one place. You can start a loan application here and review each quotation carefully before you accept anything.

Representative example: estimated repayments on a loan of R30 000 over 36 months at a maximum annual interest rate of 28% would be R1 360 per month, including an initiation fee and monthly service fees. All loans are subject to lender approval, affordability checks, and the lender’s final terms.